On the underside of the panel there are 16 location holes drilled, these are to make the assembly of the system easy. They accomodate each position: middle, edges and coners are all accomodated with these holes.
The first operation to do is to hand adjust the pedestals, place the panels on top and you are finished. The alteration of the platform is very easy, so variations on site are easily accomodated.
|
|
| |
|
|
| |
 |
the panels are lined up, adjusted and stabilised on the pedestals. |
 |
|
| |
 |
the pedestals are set inside and located over two panels. |
|
|
| |
 |
the pedestal is set inside and located in the four holes. |
 |
|
| |
|
|
|
| |
|
|
|
| |
| |
|
|
 |
ELECTRICAL EQUIPMENT
electrical outlets give you a versatile conclusion.
|
 |
| |
|
|
 |
UNDERFLOOR DISTRIBUTION
problem free distribution of cables and pipes. |
 |
| |
|
|
 |
LIGHTING
the possibility of installing step-on 12v lighting. |
 |
|
|
| |
|
|
|
|